Electric Vehicle Charging Stations – Permits Required
There have been a surge of electric cars being sold throughout NJ. An EV charging station supplies electricity to recharge electric or plug-in hybrid vehicles (PHEV) to minimize the charging time.
Just like any other electrical installation, the charging systems for electric vehicles are required to comply with the construction codes adopted by the State of New Jersey in the Uniform Construction Code (UCC).
If you would like to install an electric car charger at your home please contact us for the permit paperwork. We can mail it to you or you can stop by and pick it up. If you have additional questions please contact the building department at 732-536-0200 x 1800.
REMINDER TO CALL FOR FINAL INSPECTIONS
Once your building permit has been approved, you can begin construction. However, don't forget the critical step of scheduling the required inspections. Inspections are required before you cover or conceal any work that's been completed to ensure that the work you've done meets the permit requirements. Depending on your project type and size, you may need to schedule a few inspections.
Call for final inspections before you use your newly permitted item(s) including Generators, Solar Panels, Pools (both in ground and above)
When installed are already powered up and please call for a final inspection for your safety before they are used.
A certificate of approval is always required in order to use your newly permitted item(s). If you have any questions or need assistance please contact the building department at 732-536-0200 x 1800
Want to start a permit, check on the status, or schedule an inspection? Go online! Permit Portal
Many people have asked, "Why is it necessary to get a permit to work in my own home?" The reasons are many, starting with the health and safety of the public, which is the responsibility of the building department. A permit assures that the building department’s fire, electrical, plumbing, or building inspector, when called, will check the work done by a homeowner or contractor to make sure that he/she complies with the construction codes. Failure to secure permits or to request inspections could result in causing a fire hazard or contaminating a building’s water supply. Furthermore, if work done without a permit causes damage which results in an insurance claim, the insurance company may hold up paying a claim if it is discovered that no permit was issued for the work. When a building is sold, the building department does a mandatory CCO inspection at which time many finished basements, basement bathrooms and other remodeling projects are found to have been done without permits. At that time the building department is requested to do "visual" inspections, which could result in reopening walls and floors to inspect the work. Additionally, homeowners and contractors may be fined for doing work without a permit. It’s just not worth it. For your own health, safety and peace of mind, 'file for a permit'.
Permits and Final Inspections Required – Notice from Construction Department
State Uniform Construction Code Updates. Letter HERE.
The Construction Division of the Marlboro Township Community Development Department is responsible for enforcing the regulations of the State Uniform Construction Code, which was established by the State of New Jersey to ensure that new construction (commercial, industrial, and residential) adhere to minimum standards of workmanship and safety. Construction Division inspectors review structural construction, plumbing, heating and air conditioning, and electrical work prior to the issuance of a Certificate of Occupancy to ensure compliance with current versions of the IBC NJ edition and IRC NJ edition, National Electric Code (NEC), National Standard Plumbing (NSPC), Energy Subcode, Mechanical Subcode, Fuel Gas Subcode, Barrier Free Subcode, and the State Uniform Construction Code. State inspectors are used to perform elevator inspections.
General Contractors Bidding opportunities
Effective January 1, 2006 all home improvement contractors must be registered with the NJ Division of Consumer Affairs. They will have to produce a registration card from the State before any permits can be issued. This is, of course, a benefit to the homeowners. For more information call Consumer Affairs at: 1-888-656-6225
General Building Information
If you are building, remodeling, or adding onto your house or business, it must be done in accordance with the State Uniform Construction Code and generally requires a building permit. Visit or call (732-536-0200, Ext. 1800) the Construction Division during the planning stages of your project, well before you begin construction, to make sure that you are proceeding according to Code and do not need to appear before the Planning Board or Zoning Board of Adjustment . An early visit will eliminate unnecessary delays in completing your project.
Construction Permit Application Process
The first step in obtaining a construction permit is to pick up a permit package from the Construction Division. The permit package will be customized based on the type of construction that you plan on performing. Be sure to completely fill out the supplied forms and adhere to the application requirements set forth below.
The Construction Division will call the homeowner or contractor when the permit is ready to be picked up. Once you have met the requirement for a building permit and paid the applicable fee, the construction permit is issued and construction can begin. A final inspection is required when the job is complete. If the project is completed in accordance with the Code, the Construction Official will issue a Certificate of Occupancy or Certificate of Approval.
General Guide as to Which Permits are Needed for Home Improvement/Home Construction Work.
Permit Application Requirements - All Permits APPLICATIONS HERE
* Note: The Township provides Notary Public Services.
There are additional permit application requirements for:
Pool Permits Additional Application Requirements
Heating/AC System Permits Additional Application Requirements
Residential Interior Alterations Permits Additional Application Requirements
Commercial Interior Alterations Permits Additional Application Requirements
Residential Additions Permits Additional Application Requirements
Commercial Additions Permits Additional Application Requirements
New Single Family Dwelling Permits Additional Application Requirements
A CONSTRUCTION PERMIT, WHICH MAY INCLUDE A BUILDING, ELECTRICAL, FIRE AND/OR PLUMBING SUB-CODE TECHNICAL SECTION, IS REQUIRED TO DO ANY OF THE FOLLOWING:
ALL CONSTRUCTION, INCLUDING BUT NOT LIMITED TO:
(THE FOLLOWING IS A GENERAL GUIDE- EACH JOB MAY HAVE DIFFERENT REQUIREMENTS AND MAY NEED MORE THAN IS LISTED BELOW)
CONSTRUCTION PERMIT APPLICATIONS FOR PROJECTS WHICH CHANGE THE FOOTPRINT OF THE BUILDING, LOT COVERAGE, USE OF THE SPACE, ETC. MAY ALSO REQUIRE A ZONING APPROVAL (PERMIT). AN APPLICATION IS ENCLOSED WITH THE CONSTRUCTION PERMIT APPLICATION WHEN OBTAINED AT THE MARLBORO TOWNSHIP CONSTRUCTION DEPARTMENT OFFICE.
Category - Permit(s) Needed
ADDITIONS - All | NEW BUILDING - All |
AIR CONDITIONING - Electric & Mechanical | GAS PIPE - Mechanical |
ALARMS - COMMERCIAL PROPERTIES ONLY Burglar - Electric Fire/Smoke/Carbon Monoxide - Electric & Fire |
POOL - Building, Electric, Gas Heater- Mechanical, Electric Propane Heater- Mechanical, Electric & Fire |
ALTERATIONS - Residential or Commercial – All | PORCH – Building, Zoning Electric if needed |
ASBSETOS REMOVAL - Building | RADON - Building, Electric |
BASEMENT REFINISHING/REMODELING - Building, Electrical, Fire and Plumbing | RAMP – Building |
BATHROOM FIXTURES Any piping changes – Plumbing (need licensed plumbing contractor or homeowner) |
ROOF - Building (Not for SFD Detached) |
CAR PORT - Building, others as needed | RAISED PATIOS- BUILDING and ELECTRIC |
CHIMNEY RELINE - Plumbing | SHED - Over 200 sq ft or over 10' high – Building, Electric (if needed) |
DECK – Building | SIDING - Building (For SFD detached if using POLYPROPELENE) |
DEMOLITION – Building- COULD BE ALL | SIGNS - Building, if needed, Electric |
ELECTRIC WORK - Electric | FIRE SPRINKLER - Fire |
ELEVATOR – Elevator, Building, Electric, Fire | STEPS - Building |
FENCE - Building- If: - around a pool or: - over 6' or: - commercial |
STOVE WOODBURNING - Building, Fire |
FIREPLACE - Building, Fire, Chimney Certification | TANK (installation, Plumbing & Fire abandonment or removal) - Fire |
GARAGE – Building - (others as needed) | TELEPHONE/COMM. POINTS/VOICE DATA/COMPUTER WIRING - Electric |
GAZEBO - If over 100 sqft & <10’ high – Building | TENANT FIT OUT - All |
HEATING/VENT/AC (HVAC) - Electric (if fuel fired equip. does not need licensed electrician), Mechanical (Also Fire if Commercial) | TRAILER –CONSTRUCTION BUILDING SALES TRAILER- All |
HOOD - Fire & Electric | TEMPORARY MOBILE HOME – All |
LAWN SPRINKLER - Plumbing (Electric if hardwiring rain sensor) | GAS WATER HEATER – Mechanical |
MOVING A STRUCTURE - Building and all utility sign-offs as for demo. Also would require footing/foundation application for setting the structure in new location. | WINDOWS - adding, enlarging, or eliminating - Building |
NOTE
All contractors are required to provide this office with a current copy of Home Improvement Contractor Registration (HIC) or other License from the State of New Jersey for all work on residential property except…...Landscaper Irrigation License.